The grid coupling of a large water pump at Sheffield Forgemasters Engineering Ltd. (S.F.E.L.) was coming to the end of its operational life. To avoid costly re-engineering of the pump S.F.E.L. wanted to commission a bespoke coupling to match the original’s footprint. While most suppliers were unable to produce a coupling to the right size, Altra Industrial Couplings was able to match the design of the original and work in partnership with S.F.E.L. to produce it. Read Article




